Average Time for Developing a New Product: 45 Days
Average Number of New Products each year: 10 Sets
Department Profile:
We have professional machines and test equipments for research and development mission. These help us to increase our developing efficiently and shorten production lead time on products or new items.
Generally we only take about 10 days to finish one set computer mouse molds. And with our professional engineers with skillful CAD and 3D drawings, rich experience to reach international standards and new designs, we assist some clients to reach the CE test and EN test. No matter from technics or cost, we take hands with clients to reach a high stage in the past years and even in the coming days.
Machinery/Equipment for R&D:
| Name | Quantity | |||||
| Spectrum Analyzer | 1 | |||||
| Frequency Meter | 1 | |||||
| Digital Storage Oscilloscope | 1 | |||||
| FM-AM Signal Generator | 1 | |||||
| OPTICAL POWER METER | 1 | |||||
| RF Shield Room | 1 | |||||
| Switch Life Tester | 1 | |||||
| Cable Tester | 1 | |||||
| Abrasion Tester | 1 | |||||
| Switch Life Testing Machine | 1 | |||||
| Plug Bending Tester | 1 | |||||
| Injection Machine | 6 | |||||
| Coating Machine | 8 | |||||
| Silk Printing Machine | 4 | |||||
| PCB Shouldering Machine | 1 | |||||
| Ultrasonic Plastic Welding Machine | 1 | |||||
Home | Company Facts | Factory Tour | OEM/ODM Capability | R&D | Quality Control | Online Sales Chat
Copyright © 2001-2010 ATake Digital Technology (Shenzhen) Co., Ltd. | TEL: +86 755 27737950 | Email: oem@atake.com.tw